Concrete slabs wood subfloors and the wood flooring placed above a slab or subfloor are by their very nature porous.
Why test for moisture content of slab before laying hardwoods.
Qualitative moisture tests electrical impedance test and electrical resistance test moisture meter follow meter manufacturer s instructions.
Dry the room and test again optional if moisture appeared on the top side of the plastic dry out the room with a dehumidifier or other method then retest the floor with the plastic squares.
For woodworkers who build cabinets fine furniture musical instruments dishes toys decorative art boat restoration or various other wood products the acceptable wood moisture content normally ranges from 6 to 8.
How to do a moisture test for concrete slabs.
Determining moisture content of both the wood flooring and the subfloor is an important part of quality control in the flooring installation process.
Use moisture meters designed specifically for concrete moisture testing.
The hardwood flooring s moisture content mc should be in balance with its surrounding ambient environment to support the.
You can combine them to get the best read of your moisture conditions.
Slabs less than 60 days old are generally too wet to install floors.
Before moisture testing begins the concrete slab must be a minimum of 30 days old.
You must test the concrete slab for excessive moisture.
With summer quickly approaching rising humidity levels can compromise your wood floor installations if not accounted for.
Moisture levels can be read with a meter like the wagner mmc 220 this is a pinless meter and allows you to get an accurate reading without sticking pins into the floor and creating pinholes.
The normal moisture content of wood or emc varies from 7 19 depending on the rh in the air.
But before you begin it s important to understand that moisture measurement and management is crucial to both the concrete slab and also the hardwood flooring.
The american society for testing materials astm has several standard tests for measuring moisture levels in a concrete slab.
Test for dryness new concrete is heavy with moisture and it must be a minimum of 30 days old before moisture testing begins.
Concrete slabs and floors can be excellent subfloor surfaces for tile and other floor coverings but too much moisture in the concrete can cause problems with flooring installations.
Flooring specialists can test the moisture content of a wood subfloor using the pinless wood.
If your subfloor is above 12 moisture dry out the subfloor before installing hardwood floors.
Moisture on the inside of the plastic in the form of dampness or even fogginess indicates the slab is expelling moisture in measurable amounts.
How to check moisture content in concrete floors.